Dooley Residence
Client:
Location:
Completed:
1 Nov
2010
Budget:
Contractor:
Project Details
360 Images
No items found.
No items found.
"The facility was elongated due to the characteristics of the site. The Skate Path was a great idea that allows for a 120m long flow line with a diverse range of obstacles."