Swung by the Waterview Skatepark construction site, designed by Boffa Miskell, towards the end of last week. Looks like a few more pours have been made by Timco Construction and Premium Skatepark Designs. Check the below photos for progress photos.
"The facility was elongated due to the characteristics of the site. The Skate Path was a great idea that allows for a 120m long flow line with a diverse range of obstacles."