This design addition to Vic Park Skate Plaza incorporated new skate features to enhance the existing environment and provide a variety of new play opportunities. The enhancements including a Handrail down the 8 stair, Transitioned Ledge, Hubba Ledge, Euro Gap and Ramp, 3 Stair Rail and turnaround concrete Quarterpipe adjacent the existing Miniramp. This has been a jointly funded installation by Auckland Council, Boardertown, Amazon, Element and G Shock.
Photos courtesy of Matty P Photography
"The facility was elongated due to the characteristics of the site. The Skate Path was a great idea that allows for a 120m long flow line with a diverse range of obstacles."