The team have been chipping away at the Hayman Skatepark Renewal. The majority of existing features have had their first wave of resurfacing with most of the earthworks completed for the new quarterpipes and slabs. The first concrete slab also went down for the skate kerb and furniture area with the main deck soon to follow. Diamond Grind Coping is currently being imported for the two new quarterpipes surrounding the main taco.
Click HERE for the final design.