The Knights Stream Skatepark has been making steady progress with the majority of the flow bowl and skate avenue areas completed. The contractors have started on the main open space area with the standard manny ledge taking shape and concrete strip footing installed for the long turnaround quarterpipe.

Click here for the original design

No items found.

"The facility was elongated due to the characteristics of the site. The Skate Path was a great idea that allows for a 120m long flow line with a diverse range of obstacles."